If your home still has 100A service, or a fuse box, or you are adding solar, a battery or an EV charger — this is the job that has to happen first.

How it works

What actually happens

Four steps — and the order is not the one most people expect.

Step 01

We call the utility for a meter spot

This is where the job starts — not with a permit, and not with buying anything. We contact the utility to get a meter spot released, and at the same time prepare the paperwork they need: load calculation, single-line diagram and site plan. Same requirement whether it is your house or your building.

We handle it
Step 02

The spot is released — then we order material

Only once the utility signs off do we buy the gear, set the date and pull the city permit. Doing it in that order is what keeps a job from stalling half-finished with the power off.

We handle it
Step 03

We do the work

Power off for four to eight hours. You will have the window the day before, so you can plan the fridge and the school run around it.

Your part
Step 04

The city signs it off

Inspected, on record, and you get the paperwork for your file.

We handle it
Why the utility comes first: most people assume you pull a permit and get started. Under the current protocol the utility has to release a meter spot before anything else can happen — before material, before permits, before a date is worth setting. It is also the call that decides whether the panel can move location at all. Contractors who buy gear first are the ones whose jobs sit open with the power off.

On your side: pick a day, and be home for part of one. As easy as flipping a switch.
Pricing

What affects the price

Every job is different. These are the things that actually move the number.

Your existing service

Going from 100A to 200A is routine. Coming off a fuse box or knob-and-tube means more work behind the wall.

Where the panel sits

An exterior wall beside the meter is straightforward. An interior panel on the far side of the house is not.

What you are adding

A battery, an EV charger and solar all draw from the same service. Sizing for all three now is cheaper than doing it twice.

Overhead or underground

Underground service reroutes cost more and take longer to schedule with SCE.

Grounding and bonding

Older homes often need the ground electrode system brought up to current code as part of the work.

Permit and inspection

Included in what we quote. We do not bill it separately after the fact.

Do you need this?

Signs it is time

  • Breakers that trip when the AC and the microwave run together
  • A fuse box, or a panel with screw-in fuses
  • Federal Pacific, Zinsco or Challenger panels — known fire risks that insurers increasingly refuse to cover
  • Lights that dim when a large appliance starts
  • You are planning solar, a battery, or an EV charger
  • Anything warm to the touch, buzzing, or scorched around the panel — call us today, not next week
Recent work

A job we did

PHOTO SLOT — KARO'S OWN
200A UPGRADESUNLANDPERMITTED1 DAY

100A fuse box to a 200A main service, including a new ground electrode system and utility reconnect. Permitted and inspected. Homeowner was adding a Level 2 charger and a heat pump.

Common questions

What people ask

How long is the power off?

Typically four to six hours on a standard residential upgrade. We give you the window the day before so you can plan around it.

Do I really need a permit?

Yes — and you want one. Unpermitted panel work turns up in escrow, and insurers can deny claims on it. It is included in what we quote.

Can you do it without going through SCE?

No. The service disconnect has to be coordinated with the utility. We make that call and schedule it.

Is 200A enough if I add solar and a battery later?

Usually, for a typical home. If you are planning solar plus battery plus EV charging plus a shop, we will talk about 400A now rather than twice.

Get a quote — Panel upgrades

SAME-DAY RESPONSE · C-10 LICENCED · PERMITS INCLUDED

Please enter your name
We need a number to call you back
Which city is the job in?
Pick the closest option
Add a photo of your panel — optional, but it tells us a lot before anyone picks up the phone

Request received

Thanks — we have got it. You will hear back today, usually within a couple of hours.

Demo only — nothing was sent anywhere and no information was stored.

VoltCalc Electric Inc.
C-10 ELECTRICAL LICENCE #1084269 · BONDED & INSURED · SUNLAND, CA 91040
(818) 669-0287 · karo@voltcalc.com · Mon–Sat, 7am–6pm
Serving Sunland, Tujunga & greater Los Angeles