If your home still has 100A service, or a fuse box, or you are adding solar, a battery or an EV charger — this is the job that has to happen first.
Four steps — and the order is not the one most people expect.
This is where the job starts — not with a permit, and not with buying anything. We contact the utility to get a meter spot released, and at the same time prepare the paperwork they need: load calculation, single-line diagram and site plan. Same requirement whether it is your house or your building.
We handle itOnly once the utility signs off do we buy the gear, set the date and pull the city permit. Doing it in that order is what keeps a job from stalling half-finished with the power off.
We handle itPower off for four to eight hours. You will have the window the day before, so you can plan the fridge and the school run around it.
Your partInspected, on record, and you get the paperwork for your file.
We handle itEvery job is different. These are the things that actually move the number.
Going from 100A to 200A is routine. Coming off a fuse box or knob-and-tube means more work behind the wall.
An exterior wall beside the meter is straightforward. An interior panel on the far side of the house is not.
A battery, an EV charger and solar all draw from the same service. Sizing for all three now is cheaper than doing it twice.
Underground service reroutes cost more and take longer to schedule with SCE.
Older homes often need the ground electrode system brought up to current code as part of the work.
Included in what we quote. We do not bill it separately after the fact.
100A fuse box to a 200A main service, including a new ground electrode system and utility reconnect. Permitted and inspected. Homeowner was adding a Level 2 charger and a heat pump.
Typically four to six hours on a standard residential upgrade. We give you the window the day before so you can plan around it.
Yes — and you want one. Unpermitted panel work turns up in escrow, and insurers can deny claims on it. It is included in what we quote.
No. The service disconnect has to be coordinated with the utility. We make that call and schedule it.
Usually, for a typical home. If you are planning solar plus battery plus EV charging plus a shop, we will talk about 400A now rather than twice.